by avodah_studio | Mar 3, 2021
Owner: US Department of Homeland Security, United States Coast Guard Traverse City Project Completed: January 2008 Sault Ste Marie Project Completed: August 2008 Per contract drawings and specifications, Master Electric Inc. installed a multi-building, networked fire...
by avodah_studio | Mar 3, 2021
Owner: Saginaw County Project Completed: September 2011 This project consisted of retrofitting and replacing existing light fixtures and installing an occupancy sensor lighting control system in eleven Saginaw County buildings: The County Jail, 911/Sheriff, Court...
by avodah_studio | Mar 3, 2021
Owner: United States Army Construction Manager: Wolverine Fire Protection Completed: June 2012 Master Electric completed the installation of a sophisticated fire alarm detection system in four buildings. The U.S. Army uses these buildings to manufacture hand grenades...
by avodah_studio | Mar 3, 2021
Owner: USGA OAG Reston Acquisition Branch Construction Manager: Spence brothers Project Manager: Jeremy Ranck/Jim Conger Completion Date: September 2018 The mission of the Hammond Bay Biological Station in Millersburg, MI, is research and testing for control of sea...
by avodah_studio | Mar 3, 2021
Contracting Agency: U.S. Army Prime Contractor: Master Electric Self-performed labor: 100% Subcontracted: System Test and Programming Completed: July 2013 This was a large Design/Build Fire Alarm Replacement completed at the United States Army Garrison, Fort Detrick,...