Heritage High School
Saginaw, Michigan
Owner: Heritage High School
Prime Contractor: Wolgast Corporation
Completed: July 2012
At Heritage High School Master Electric completed new wiring for a newly constructed cafeteria. This remodel included new sub-panels to feed the kitchen equipment, lighting, and general-purpose power. We installed a 150-kW gas generator for backup power as well as extending the existing Simplex fire alarm system to cover the new addition. Master Electric added a new PA system with the inclusion of adding phones and data to the existing system.