Owner: Birch Run Public Schools
Construction Manager: R.C. Hendrick & Son, Inc.
Completed: September 2013
Birch Run’s 2013 Lighting Renovations gave the school system a fresh new look and plenty of energy savings.
Existing lighting was completely removed at the High School, Middle School, and Elementary School. Once each site had been cleared, new underground power was put in and efficient LED parking lot fixtures were stood in place.
Over at the football stadium, obsolete quartz sports lighting was taken out so Musco Light Structure Green System could be put back in its place, providing the school with high-efficiency lighting and integrated control.
In addition to new Stadium and Parking Lot lighting, Birch Run Middle School’s Science Labs got a much-needed equipment upgrade and the High School added on a new Band Room and Video Production Room.
Master Electric was proud to be a part of Birch Run’s 2013 Renovation Project and was very excited to present Birch Run School System with a $30,000 Consumer’s Energy Rebate Check.